Shelby Wastewater Treatment Plant

Shelby Wastewater Treatment Plant

Location

This project included several additions to an existing plant, as well as construction of new buildings.

The scope of the work included:

  • New aeration basin
  • Two new final clarifiers
  • 700,000 square foot compost building
  • Processing facility
  • Operations building
  • Blower building
  • Maintenance facility
  • Trickling filter, 140-ft. in diameter
  • New chlorine contact chamber

A substantial amount of the work was self-performed, including new mechanical piping and equipment, and all concrete work.

The concrete work included walls from 12 inches to 2 feet thick, a half-acre slab storage area, and slabs with metal hardener.