Saint Thomas Sports Park is the home of the Tennessee Titans’ practice facility and corporate offices located in Nashville, Tennessee. PBG Builders was selected to expand & renovate the existing kitchen and dining facilities.
PBG Builders was instrumental in working with the City of Nashville and Davidson County Metro Codes department to provide cost effective solutions for the kitchen renovation to meet current building codes with minimal disruption to the facility. This project had tight timelines with a duration of only 5 months and a non-negotiable end date of July 8th. Timing was critical because all work had to be completed before the Tennessee Titans returned in July for football training.
PBG Builders managed the pre-design planning, design phase, budgeting, and construction. The project required the removal of existing paving, installing a new fire line service from Great Circle Road, adding more than 1,200 square feet of exterior sidewalks, as well as landscaping and asphalt paving work.
This 5,000 sqft renovation and addition the dining and kitchen facilities consisted of erecting a structural steel structure, pouring a 2,200 sqft monolithic slab with 24” turndowns, extensive underground and above ground plumbing work, new rooftop mechanical equipment to serve the new kitchen area and kitchen equipment, and a new sprinkler system. Metal stud walls with an EIFS envelope was used as a cost-effective solution to match the unique shapes and appearance of the existing pre-cast panels.
New flooring, ceilings, light fixtures, paint, TVs, and glass walls were installed throughout the renovation and addition creating a whole new look with football vibes.